Will FourJaw Energy Monitoring work on all my machines?

The short answer is yes.

Current Range

The current clamps we use work on any machine where each phase has a current draw from 50mA-100A.

3-phase or 1-Phase

If your machine uses 3-phase electricity, simply clamp around one phase of the main incoming supply and make sure the machine has 3-phase chosen in Energy Settings. If 1-phase, clamp around the one cable and choose 1-phase in settings. 

Age, Make and Model

The age, make or model of the machine doesn’t impact the efficacy of the FourJaw platform.

Exceptions

Sometimes to optimise productivity and energy monitoring at the same time, the clamps need to be moved to be on both the power supply and a particular spindle. If this is the case, our support team will work with you to get this right.